Shijiazhuang Hutuo River Pollution Comprehensive Treatment
The river management is 10.4km long. The contents include river treatment, tunnel management and pretreatment of sewage outlets in Gaocheng district water treatment center.
Back to list >>
Detailed introduction
Project Description
The river management is 10.4km long. The contents include river treatment, tunnel management and pretreatment of sewage outlets in Gaocheng district water treatment center.
Governance strategy
In-situ repair, mud and water treatment;
Eliminating organic pollutants, fluorides and sulfides in the sediment, and treating heavy metal pollution;
Recovery and establishment of biological beds without adding foreign strains without introducing exotic species;
Use environmentally friendly agents to eliminate secondary pollution.